Isle au Haut pier replacement project completed December 2009.

anderson1_300.jpg

anderson2_300.jpg

Pile supported wooden walkway with remote ramp lift located in Penobscot Bay, Maine.

Phippsburg.JPG

Town landing pier in Phippsburg, Maine.  10.5' x 47.5' approachway with a 24' x 60' L-shaped head on the outboard end and a cast-in-place concrete deck.
 

POINTEAST.JPG

Prock Marine crew working in frigid 2 degree winter temps while surrounded by sea fog at Point East in Wiscasset, Maine.
 

floatinggangway.jpg

Floating gangway that can be lifted out of the ocean using winch and cables.

alramphydrauliclift.jpg

Aluminum ramp with hydraulic arm lift.

granitesupports-lambeams.jpg

Granite supports and laminated beams.

e.meyers_edited.jpg

Laminated beams used.
 

mbna.jpg

Granite breakwater with pile supported wave screen on outer 140 feet that creates a protected marina.

RFTfinished.jpg

Rockland Ferry Terminal, Rockland, Maine.  Demolition of existing pier and transfer bridge.  Construction of new pier, two transfer bridges, dolphins, fendering and dredging.  Project completed fall of 2008.

StarIsland1.jpg

Before picture of an existing granite wall project.

StarIsland2.jpg

Completion of granite wall project.