Isle au Haut pier replacement project completed December 2009.
|
|


|
Pile supported wooden walkway with remote ramp lift located in Penobscot Bay, Maine.
|
|

|
Town landing pier in Phippsburg, Maine. 10.5' x 47.5' approachway with a 24' x 60' L-shaped head on the outboard
end and a cast-in-place concrete deck.
|
|

|
Prock Marine crew working in frigid 2 degree winter temps while surrounded by sea fog at Point East in Wiscasset, Maine.
|
|

|
Floating gangway that can be lifted out of the ocean using winch and cables.
|
|

|
Aluminum ramp with hydraulic arm lift.
|
|

|
Granite supports and laminated beams.
|
|

|
|
|

|
Granite breakwater with pile supported wave screen on outer 140 feet that creates a protected marina.
|
|

|
Rockland Ferry Terminal, Rockland, Maine. Demolition of existing pier and transfer bridge. Construction of
new pier, two transfer bridges, dolphins, fendering and dredging. Project completed fall of 2008.
|
|

|
Before picture of an existing granite wall project.
|
|

|
Completion of granite wall project.
|